Cut a two inch long notch in the front lip of the gutter with tin snips to join a rain gutter section.
Attach gutter to house.
Bracket hangers generally attach with wood screws for a secure hold.
Seams between the elbow the gutter and the downspout are typically sealed with caulk containing an aluminum sealant.
Gutters and downspouts attach to each other with a variety of connectors and corners to form a unified system.
Screw a downspout elbow to the outlet tube protruding down from the gutter.
Snap the sections together.
Leave the old spikes in place a spike head looks better than a hole in the gutter.
Loose sections can bend or crack if there are consistent winds.
If a soffit conceals the rafters look for tell tale.
Project step by step 20 cutting the gutter.
Either way put end caps on the end of the gutter that does not got to a downspout.
Connect downspout to gutter secure the downspout outlet to the gutter with four pop rivets or screws.
It s much easier to join sections on the ground than to work from the top of a ladder.
As long as you have good weather a partner and the right tools and a sturdy ladder you should be able to install gutters on an entire one story house in a weekend or two.
Find the location of the rafter tails behind the fascia board.
If you have half round gutters snap them into place after installing the brackets.
Just hook the bracket under the front lip of the gutter and then screw the other side of the bracket to the fascia.
If you have k style or other brackets you will have been installing the pieces of gutter as you go.
Hold another elbow against the house and cut a piece of downspout to fit between the two elbows.
Chalk a line along the length of the fascia board starting at the top the non downspout end 1 1 4 inches.
How to attach guttering to existing fascia 1.
Use needlenosed pliers to.