Building code also requires that the.
Attic ceilings finishing.
The plywood will create a smooth strong ceiling without having to apply drywall tape and mud to the ceiling.
Make sure the fill s depth is uniform across the attic.
For a finished attic to be to code it must satisfy the same living requirements of other rooms sometimes called the rule of sevens any living space in a home needs to have at least 7 feet 2 1 m of clearance from the floor to the ceiling and there needs to be at least 70 square feet of space available at least 7 feet 2 1 m in each direction.
Step 1 check the ceiling height.
In the first step a knee wall is installed.
Select attic lighting photo by alan shortall.
Flip the reverse switch in wintertime and it will push warmer air down to keep you cozy.
Use screws to attach sheets of birch plywood to the angled ceiling over the insulation making sure to drive the screws into the ceiling joists.
Finishing your attic can add space and utility and increase the value of your home as long as it s done properly.
The attic floor which is the ceiling of the living space below often already is insulated.
A bedroom dressing area and master bathroom.
When done without proper planning or adherence to local building codes it can actually reduce the value of your home or stall a sale.
Stairs can take up a lot of space in both the attic and in the floor below so they are important considerations for planning.
Finished attics need stairs that meet all of the standard staircase requirements.
Put in a ceiling fan for better climate control photo by william enos.
If you ve got headroom a fan will make a finished attic more comfortable in warmer months by giving you a cool breeze indoors.
Now let s read about the steps for properly finishing the attic walls and ceiling.
Fasten blocking around the hatch or door to allow the material to be installed around this area without escaping.
To make it easy to eyeball how level the material is as you blow it in screw depth guides to joists throughout the space.
If it is and you plan to provide heating and cooling to the finished attic space you need to remove.
This attic was divided into three zones.
To give the bathroom a spa like feel luxe features were added like a soaker tub a frameless shower enclosure a new toilet complete with heated seat and led lights marble and glass mosaic tiles and a crystal chandelier.
Step 1 framing of the top and sides of the knee wall.
Run the plywood down to the top of the knee wall.
In general stairs must be at least 3 feet wide and provide at least 6 feet 8 inches of headroom.
Here are some must do tips to follow when finishing your attic.
To meet all three goals insulating your finished attic ventilating the roof and maximizing headroom use a combination of dense batt insulation rigid foam sheeting and air chutes.